BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 23, 2020 at 7:00 PM

Updated August 26, 2025

Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.

Pre-Qualification for Bidders: Not Required License Type Required: A- General Engineering Contractor Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that the City of Santa Cruz, its officers, officials, employees, agents, and volunteers, are additional insureds on insurance required from subcontractors. For CGL coverage subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13. (*Insurance requirements may be modified for subcontractors depending on the scope of work and degree of risk involved). Attention is directed to the provisions in Section 8 (Commencement of Work, Time of Completion and Liquidated Damages) of the Standard Specifications and these General Conditions. The Contractor shall diligently prosecute the work to completion before December 18, 2020. Full compensation for any additional costs occasioned by compliance with the provisions in this section shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefore. The work to be done, in general, consists of replacing the sewer main between manholes N7- SM603 and N7-SM601 by horizontal directional drilling, abandoning manhole N7-SM609, N7- SM601 and N7-SM603, constructing new manholes N7-SM623 and N7-SM624, installing pipe adapters, replacement and reconnection of residential sanitary sewer laterals and restoration of surrounding pavement. The Contractor shall submit a construction schedule for the work. The City shall have review authority over said schedule. The contractor shall provide all labor, materials, tools, equipment, and services required for the complete and proper execution of all the work as shown on the drawings and/or outlined in these specifications. Work shall include items not specifically mentioned herein or noted on plans but necessary to make a complete working installation of all systems shown or described herein.

Award

Water / Sewer

$98,000.00

Public - City

Site Work

5

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
184
Bidding Soon
2,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2020

November 19, 2020

Project location map

Union St, Santa Cruz, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.