EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2021 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Harrisburg, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of May 14, 2021, this project has been awarded to Jay Fulkroad & Sons, Inc. for $1,993,476.99. Project Location: Work Location No. 1 - Bridge No. 1 Superstructure Replacement,T-390 Fiddlers Elbow Road over Swatara Creek in Derry Township and Lower Swatara Township, Dauphin County, PA Work Location No. 2 - Bridge No. 56 Superstructure Replacement, T-702 Engle Road over Conewago Creek in Londonderry Township, Dauphin County and Covered Bridge Road over Conewago Creek in Conoy Township, Lancaster County, PA; also known as Lancaster County Conewago Bridge No. 1 The estimate is $2,300,000 - $2,700,000. The Project primarily consists of replacement of two superstructures and associated Work. Contractors bidding on this Project must be prequalified by the Pennsylvania Department of Transportation as prime contractors in the S work category. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10% of the bid amount and made payable to or naming as obligee Dauphin County Board of Commissioners. Dauphin County reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of Dauphin County, and to reject anyorall proposals. Removal and replacement of the Dauphin County Bridge No. 1 superstructure having a length of approximately 309 feet, reconstruction of approximately 102 feet of associated roadway approach, and otherassociated Work in Dauphin County.Removal and replacement of the Dauphin County Bridge No. 56 superstructure having a length of approximately 77 feet, reconstruction of approximately 130 feet of associated roadway approach, and other associated Work in Dauphin and Lancaster Counties. The Work will be substantially completed on or before August 6, 2021, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before September 3, 2021.

Award

Bridges / Tunnels

$1,993,476.00

Public - County

Demolition, New Construction, Paving, Site Work

54

1

5

9

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques, Storage Specialties, Postal Specialties
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Marine Construction and Equipment, Marine Specialties, Buoys

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
100
Bidding Soon
1,406
All Active Projects
603
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2020

January 15, 2021

img_map_placeholder

Multiple Locations, Harrisburg, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge No. 1 and Bridge No. 56 Superstructure Replacements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.