EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 16, 2021 at 7:00 PM

Updated October 1, 2024

Demolition, site work and new construction of an educational facility in Raleigh, North Carolina. Completed plans call for the demolition of a educational facility; for the construction of a 112,000-square-foot educational facility; and for site work for a educational facility.

The Fuller Elementary School project consists of (1) complete demolition of existing buildings, including abatement of hazardous materials and (2) constructing new multi-story 112,000 SF elementary school building Site is located at 806 Calloway Drive, Raleigh, NC 27610 Bid Result General Trades C B & H Contracting $160,000 Final Cleaning CB&H Contracting $28,500 Building Concrete Briegan Concrete $1,531,435 Turnkey Masonry Brodie Contractors $1,809,900 Turnkey Steel Steel and Pipe $1,960,436 Roofing AAR of NC $1,225,000 Caulk & Sealants J T Murphy Construction $274,500. Doors & Hardware Martin Architectural $380,000 Metal Studs & Drywall Triad Walls & Ceilings $1,976,000. Hard Tile Concordia Building $98,265 Acoustical Ceilings Acousti Engineering $290,673. Painting DWH Painting $266,070 Epoxy Resin Terrazzo Flooring David Allen Company $99,207. Signage AOA Signs $38,736 Operable Partitions Proven Products $96,220 Food Service Equipment Singer Ashland 278,927 Casework Stevens Industries $343,882 Elevators Delaware Elevator $114,195. A Fire Suppression J&D Sprinkler $309,750 Plumbing D&L Plumbing $1,893,273 Mechancial / HVAC SPC Mechanical $2,650,720 HVAC CONTROLS Engineered Control Solutions $388,750. HVAC TEST & BALANCE Airflow Experts, Inc $58,692. Electrical JC Electric, $2,665,000 Turnkey Sitework Fred Smith Company $4,571,500 Landscaping Southern Garden, Inc $728,054.

Bid Results

Educational

$24,237,685.00

Public - County

Demolition, New Construction, Site Work

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Building Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Roofing and Siding Panels, Composite Wall Panels, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Expansion Control, Expansion Joint Cover Assemblies
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Acoustical Tile Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Special Wall Surfacing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Plaques, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Equipment, Office Equipment, Computers, Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Healthcare Equipment, Therapy Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Furnishing Accessories, Clocks, Furniture, Seating, Chairs, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems, Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Potable-Water Storage Tanks, Facility Sanitary Sewerage, Sanitary Sewerage Pumps, Facility Storm Drainage, Roof Drains, Sump Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems, Swimming Pool Pumps, Fountain Plumbing Systems, Fountain Pumps, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Facility Fuel Systems, Facility Fuel-Storage Tanks, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Packaged Water Chillers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Transfer Switches, Manual Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Unit Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks, Electrical Utilities, Utility Transformers, Site Grounding, Site Lightning Protection
Division 34 - Transportation

Division 34 - Transportation

Transportation Construction and Equipment, Roadway Construction
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
71
Bidding Soon
1,235
All Active Projects
499
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2020

December 21, 2020

img_map_placeholder

806 Calloway Dr, Raleigh, NC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fuller Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.