BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2021 at 7:00 PM

Updated September 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Brasher Falls, New York. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.

Sealed bids for the furnishing of all labor and material necessary for Replacement of Depot Street Bridge over Deer River . As a result of the unprecedented public health emergency related to COVID-19, we have been directed by the State of New York to practice social distancing to help slow the spread of this virus. In order to protect members of the public and county staff, we will be making the following changes to the bid opening for above referenced bid. County staff will open and witness the opening of the bids. Bidders and other members of the public will not be allowed in the room. It is our intent to provide a live stream of the bid opening utilizing YouTube that will allow bidders and other members of the public to witness the bid opening. Approximately 15 minutes before the scheduled bid opening a link will be provided on the homepage of the County Website https://www.stlawco.org/ Delivering Bids in Person: Since access to the Courthouse is limited, you will need to call the Purchasing Office at 315-379-2207 upon your arrival in the parking lot and staff will accept your bid at the entrance of the 1993 Addition to Courthouse. We strongly encourage all vendors to submit bids as soon as possible. Bidders will be fully responsible for the delivery of their bids in a timely matter. Late bids will not be considered. The project consists of replacing the existing single span crossing of Depot Street over the Deer River in the Town of Brasher with a new structure. The proposed bridge will consist of a single span, multiple steel girders with a composite concrete deck system. The superstructure will be supported on cast-in-place concrete abutments on driven steel H-piles. Approximately 800 linear feet of the approach highway will be reconstructed as part of the project. The work on the approaches includes full depth reconstruction, closed drainage and guide rail installation. Traffic will be maintained on an off-site detour route during construction. Disadvantaged Business Enterprise Utilization Goal 4% Female Participation Goal = 6.9% Minority Goal = 2.5%

Award

Bridges / Tunnels

$2,797,686.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
258
Bidding Soon
3,178
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2020

January 7, 2021

Project location map

Depot St, Brasher Falls, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.