EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in Mukilteo, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project has been awarded to Granite Construction Company in the amount of $794,953. The work to be performed under these specifications consists of furnishing all Labor, tools, materials, and equipment necessary for construction of the Harbour Reach Drive Improvements. Specific work includes, but is not limited. to, HMA pavement overlay, HMA pavement repair, pavement grinding, installation of cement concrete curb ramps, replacement of concrete sidewalk. panels, utility adjustments to grade, pavement striping. pavement markings, permanent signing, and advanced traffic loops. The estimated cost for this project is in a range of $850,000 to $950,000. This contract involves public work Workers performing work in conjunction with the project shall receive the prevailing rate of wage pursuant to the Prevailing Wages on Public Works Act (Chapter 39,12 RCW) Each bid shall be accompanied by a bid bond in the form of certified check, cashier's check or surety bond in an amount equal to at least 5% of the amount of such bid, Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid bond shall be forfeited to the City of Mukilteo. Questions regarding this project shall be submitted in writing to Connie Bowers, P.E. via fax (425.290.1009) or email (chow-ers@mukilteowa.goy). Questions via phone not be accepted. Bidders shall submit questions no later than 5 days prior to bid opening. The City of Mukilteo reserves the right to reject any and all bids and to waive informalities and minor irregularities in the bidding documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE : 7.2% WBE : 6.9%

Award

Roads / Highways

$794,954.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
35
Bidding Soon
1,065
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2021

September 3, 2021

img_map_placeholder

Harbour Reach Dr, Mukilteo, WA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Harbour Reach Drive Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.