BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2024 at 8:00 PM

Updated March 30, 2024

Site work and paving for a civil project in Niles, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of March 29, 2024, an engineer has been selected. Construction is expected to begin Summer 2025. *The closed solicitation has been included below for reference: The Village of Niles will be accepting qualifications for providing: Professional Services for Melvina Avenue Improvement Concept Design Phase II Roadway Design Watermain Improvement Design. The Village plans to rehabilitate Melvina Avenue from Touhy Avenue to Gross Point Road. The project is programed for TIF and water funding sources. The Village also intends to replace a portion of the existing Melvina Avenue watermain from Touhy Avenue to Gross Point Road. The watermain work will be an advance contract funded with local funds. The Village has purchased the adjacent Grainger property and has a good working relationship with the businesses in the area. There may be an opportunity to place the watermain in an easement outside the western Right of Way line. There are three primary services required for this Project: 1. Concept Design and Traffic Engineering 2. Watermain Improvement Design 3. Phase II Roadway Design 4. Right-of-Way Negotiation and Acquisition Support The respondent must submit a team covering all three portions of the scope of work. The total project construction budget, excluding design and professional fees, is: $1,500,000. The budget breakdown is as follows: Roadway Improvements: $900,000 Watermain Replacement: $600,000 As of November 12, 2020 this project is seeking qualifications for designer. Engineering Contract approval is expected in January 2021. Concept design will be complete by April 30, 2021. Phase II roadway design is projected to start early April 2021 and be completed by late October 2021. The schedule may be delayed based on redevelopment activities. Roadway letting is scheduled for summer 2022 or may be delayed to coincide with Touhy Triangle Redevelopment. The watermain design is expected to be slated for late spring 2022 bidding and mid summer 2022 construction. If the selected consultant sees value in packaging both the watermain and roadway project together, the Village is willing to consider that option. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Roads / Highways

$4,400,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
499
Active Projects
275
Bidding Soon
3,613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

Project location map

N Melvina Ave, Niles, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.