BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2021 at 7:00 PM

Updated December 7, 2024

Site work and renovation of a municipal facility in Leesburg, Virginia. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

This reclamation project is a voluntary remediation of the oldest, unlined portion of the County Landfill, which is located in the middle of the existing landfill between Phases I and II. This existing, unlined area is the accepted source of pollutants in facility groundwater and poses a future remediation liability. This project consists of removing solid waste and cover soil from the earliest disposal areas within the facility. Following the removal and relocation of the waste to other lined areas of the landfill, the reclaimed site would then be lined per current regulatory standards and used for new disposal operations. Fees generated by the additional capacity gained from the reclamation will offset the majority of costs associated with the project. The anticipated benefits of executing this project are to: 1. remove the source of groundwater contamination at the landfill; 2. remediate current groundwater contamination; and 3. gain cost effective, new landfill capacity without expanding the disposal footprint or constructing new infrastructure. This project is anticipated to be phased over a multi-year period utilizing contracted services. The Department of General Services manages the Loudoun County Solid Waste Management Facility (Landfill). Operating costs for landfill disposal operations are offset by fees collected for service at the facility in keeping with the Loudoun County Board of Supervisors' policy of revenue neutrality for landfill operations. No additional operational resources are required for the reclamation project. The project is included in the county's 2021-2026 Capital Improvement Program (CIP). As of November 17, 2020, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Substantial Completion 245 Calendar Days after Notice to Proceed Completion of all punch list work 30 Days after Substantial Completion

Award

Municipal

$4,850,538.00

Public - County

Renovation, Site Work

1

8

17

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
191
Bidding Soon
3,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.