Site work and paving for a road / highway in Lusk, Wyoming. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work is described in the plans and specifications and on the bid schedule, and consists of the following major quantities (approximately): Road Grading 5.0 Miles Haul and Place Owner-Supplied Aggregate (3'') 8,605 Tons Because the aggregate hauling distance is so great, the project also includes an alternate for Contractor Supplied Aggregate (Grading "J-R"), along with various other minor items as listed on the bid schedule. Bids must be submitted on proposal forms provided in accordance with the contract documents. "...the contract shall be let to the responsible certified resident making the lowest bid if the certified resident's bid is not more than five percent (5%) higher than that of the lowest responsible nonresident bidder." Contractor shall furnish to Owner performance and payment bonds as security for the faithful performance and payment of all his obligations under the Contract Documents. The Work will be substantially complete within 130 days from the date of the Notice to Proceed, and will be completed and ready for final payment in accordance with the General Conditions within 10 days from the date of the Certificate of Substantial Completion. Time will not be counted when the project is officially suspended by the Owner due to acts of God, winter shutdown, and suspensions directed by the Owner. Niobrara County reserves the right to reject any or all bids or schedules, and to waive minor irregularities and formalities therein, and to award the contract in whole or in part in the best interest of the Owner. All roads to be rehabilitated shall be graded and shaped, and then gravel shall be hauled and placed on the surface. Layback the topsoil and vegetation, grade inside the existing right-of-way to reshape roadway where needed to meet the appropriate typical cross-section and to meet the specified compaction requirements, replace removed topsoil and vegetation. This work shall include furnishing, placing, relocating, maintaining, and removing temporary traffic control. Temporary traffic control shall include signs, barricades, flaggers, and other traffic control devices necessary to safely control vehicle and pedestrian access around the work site. The road rehabilitation work as defined in the Project Plans is located entirely within existing Right-of-Way boundaries of Cheyenne River Road. The beginning point of the project is 13.2 miles west of U.S. Highway 85 on Cheyenne River Road, which is located 50.5 miles north of Lusk, in Niobrara County, Wyoming Bid opening for the Niobrara County 2020 Road Rehabilitation will be open to public. Please wear a mask if attending in person, and a zoom meeting option is available. Below is the Zoom meeting information for tomorrow’s bid openings. Thank you, Join Zoom Meeting https://zoom.us/j/91264648784 Meeting ID: 912 6464 8784 Dial by your location +1 346 248 7799 US (Houston) +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York) +1 301 715 8592 US (Washington D.C) Meeting ID: 912 6464 8784 Bid- results Base Bid A Wyoming Earthmoving Corporation - 128603 Base Bid B Timberline Services - 177529

Award

Roads / Highways

$177,529.00

Public - County

Paving, Site Work

8

1

4

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
6
Bidding Soon
37
All Active Projects
20
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2021

February 4, 2021

img_map_placeholder

Multiple Locations, Lusk, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.