BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.

**As of May 25,2021 This project has been awarded. Start date and completion date has not yet been established.** The City of Santa Cruz Water Department is prequalifying Prime Contractors (prospective bidders) for the Laguna Creek Diversion Retrofit Project (Project) located at 3030 Smith Grade in the community of Bonny Doon in unincorporated Santa Cruz County. The Project would involve the Laguna Creek Diversion Facility, an existing water supply source generally consisting of a small masonry dam and passive diversion into a flume and pipeline. The Project would involve construction of a new intake structure with an embedded Coanda screen at the downstream face of the dam. Other components of the Project would include tree removal and site preparation, construction of a coffer dam and stream bypass system, installation of intake structure appurtenances, a new valve control vault and diversion pipeline, new monitoring and control equipment, riprap bank stabilization along the creek bank, and site access and safety improvements. All questions about the meaning or intent of the Prequalification Documents are to be submitted in writing to Jessica Martinez-Mckinney via email at jmartinezmckinney@cityofsantacruz.com. Questions received less than five (5) days business days prior to the submittal date may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Project Engineer's Estimate: AACE Class 3 Cost Range: $1.11 Mil - $1.42 Mil The Engineer's estimate anticipates that the total bid price will be $1,744,000 The Preliminary Contract Schedule is 180 Working Days. Shortlist Confirmed.

Award

Water / Sewer

$1,551,550.00

Public - City

Site Work

22

1

12

9

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
1,280
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2021

June 8, 2021

img_map_placeholder

3030 Smith Grade, Santa Cruz, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.