BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2021 at 7:00 PM

Updated October 24, 2023

Site work for a civil project in Fishers Island, New York. Completed plans call for site work for a water / sewer project.

**As of February 11, 2021, the project has not been awarded. A timeline for the award is not yet determined.** The Project consists of constructing a new septic system at the existing Firehouse at 250 Athol-Crescent on Fishers Island, in preparation for the construction of a proposed building addition, and the abandonment of the existing system. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. A pre-bid conference will not be held. Bid security shall be furnished in accordance with the Instructions to Bidders. Service-Disabled Veteran-Owned Set Aside: No Contract term: 90 Days The Contractor shall provide all labor, material, and equipment necessary to complete the installation of the proposed septic system including, precast concrete Gallery Units, two compartment precast concrete Septic Tank, precast concrete Grease Trap and distribution piping as depicted on the plan approved by the Suffolk County Department of Health Services (SCDHS). The Contractor shall provide all labor, material, and equipment necessary to abandon the existing Septic System in accordance with SCDHS requirements, and shall provide all information required for completion of Form WWM-080. The Contractor shall remove, dispose of, and replace, in accordance with the specifications, all bituminous pavement, bituminous curbing, and concrete sidewalks as required to complete the Septic System Installation. The Contractor shall coordinate all work with the Fire District to maintain access to the Truck Bay. A minimum of 48 hours' notice is required for any work that will impact access to emergency equipment. Payment for the work described in the specifications shall be paid as a Lump Sum under the attached FORM OF GENERAL BID. All work shall comply with Federal, State, and Local Laws and Regulations. The Contractor shall provide the Engineer with cut sheets of the new tank and monitoring system to be used on the project.

Post-Bid

Water / Sewer

$228,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
302
Bidding Soon
3,512
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2021

March 11, 2021

Project location map

250 Athol-Crescent, Fishers Island, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.