EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Ashfield, Massachusetts. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. No prebid meeting. Prev Wage Required. Prequal Category for MassDOT is Bridge Culvert. Project is partially funded by MVP Grant and must be completed by Sept 30, 2022. Project is being bid by Franklin Regional Council of Governments on behalf of the Town Description: The Town of Ashfield Highway Department proposes to replace an undersized culvert at the Baptist Corner Road crossing of an unnamed tributary to the Bear River. This culvert requires replacement due to deteriorating structural integrity and insufficient flow capacity. The existing culvert causes scour, impacts stream passage and creates a barrier to both aquatic and terrestrial wildlife passage. The proposed replacement of the culvert will greatly enhance wildlife passage, habitat connectivity and will fully meet the Massachusetts Stream Crossing Standards. The stream crossing upgrade will improve flows hydraulically (providing a 1.2 times bankful width span), increase flood storage, improve water quality, and restore the natural stream flow, enhancing wildlife habitat and flood protection functions. The natural substrate will be a mix of finer natural streambed materials, rounded cobbles and large boulders excavated from the historical original stream bed and augmented with outside supplied material designed to match existing stream conditions. Streambed materials will be set on top of a material base of larger stone to provide scour prevention. The proposed replacement culvert is a 19' by 4' precast three-sided structure set on inverted T precast stem walls/foundations with prefabricated segmental precast concrete wingwalls. There is no Prebid meeting for this project. Bidders may visit the site or send written questions which will be answered in consultation between the Engineer, Highway Superintendent and FRCOG .

Award

Bridges / Tunnels

$700,150.00

Public - City

Paving, Site Work

13

6

3

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
199
Bidding Soon
2,515
All Active Projects
1,172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2022

May 20, 2022

img_map_placeholder

Multiple Locations, Ashfield, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Baptist Corner Road Culvert Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.