BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hillsboro, Missouri. Completed plans call for site work for a water / sewer project.

The Project consists of constructing approximately 23,400 lineal feet of 1.25-inch, 2-inch, 3-inch and 4-inch pressure sewer main, 161 grinder pumps and appurtenances. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Nondiscrimination in Employment Bidders on this work will be required to comply with the Presidents Executive Order Number 11246. Requirements for bidders and contractors under this order are explained in the specifications. The Jefferson County Public Sewer District is an Equal Opportunity Employer and invites the submission of bids from Women and Minority Business Enterprises. Location: Weber hill Terrace and Warren Woods subdivisions of House Springs, MO. Jefferson County, Township 43N, Range 4E, Section 26 Project Description: The "Weber Hill Terrace/Warren Woods" project is taking place to provide public sewer collection service to the home owners in the respective subdivisions. Included in the project are the installation of, 23,400 lineal feet of 1.25-inch, 2-inch, 3-inch and 4-inch pressure sewer main and appurtenances. The proposed sewer main will be trenched and/or bored, creating minimal disturbance. Approximately 9,000 lineal feet of the pressure sewer will be in the street or adjacent to the street and have a gravel surface. The remaining 14,400 lineal feet will be through existing lawns. Installation of the sewer main will not alter the existing drainage patterns. Therefore, only temporary erosion control structures will be installed where existing topographic conditions necessitate their use. Depending on weather conditions the trench will be temporarily and/or permanently seeded within 7 days if not to be disturbed within 14 days. After final stabilization, the runoff coefficient for the site will be the same as it was prior to construction.

Award

Water / Sewer

$3,069,341.00

Public - County

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
42
Bidding Soon
798
All Active Projects
311
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2021

February 22, 2021

img_map_placeholder

Multiple Locations, Hillsboro, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.