Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in Altamont, Illinois. Working plans call for the demolition of a playground / park / athletic field; for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; pre-engineered storage facility; pre-engineered storage facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
As of May 2, 2024, the project is pending construction documents. An architect has been selected and general contractor bidding may begin sometime in Fall 2024. Construction is estimated to be completed by late 2026/ early 2027. *The previous solicitation is listed below for reference. --- The East Bound National Trail Safety Rest Area (D0765) is a 2,888 square foot, 2-story building constructed in 1972. The scope of work provides for demolishing the existing rest area and constructing a new public rest area facility, a new 25x25 storage building, new picnic areas, including picnic shelters and outdoor exercise/play areas. The scope also includes reviewing the existing truck lot for potential expansion with sidewalk and ADA ramps, adjusting the ramp and parking lot geometrics as needed for the new construction and installing underground utilities for future e-vehicle charging stations. The project shall include evaluating the water quality at the site, upgrading the sanitary system, including an investigation of a potential municipal connection for the sanitary system for both rest area facilities, including the west bound building (D0766) and an evaluation of the existing lagoon sanitary system located near the west bound facility for any repairs or updates needed should a municipal connection be unavailable or cost prohibitive. This work may include, but is not limited to, architectural, geotechnical, civil, structural, electrical, mechanical services and landscape design. The scope of work would also provide for new electrical service, if needed. The new building, parking and ramps shall be sited to preserve existing mature trees where possible and allow for maximum utilization of remaining property for egress to parking areas and future parking expansion. Parking areas and access sidewalks shall meet IDOT Bureau of Design and Environment Manual (D&E-01) and construction and materials standards as identified in the Standard Specifications for Road and Bridge Construction (D&E-02). APPROPRIATED AMOUNT: $500,000 PROFESSIONAL LIABILITY INSURANCE REQUIRED: $1,500,000 Building design and exterior landscaping shall reflect the significance of location and proximity to the historic National Trail and Old Cumberland Road.All demolished materials shall be removed from the site. Hazardous materials encountered during the project will be addressed outside of the project. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. A combined MBE/WBE goal of 18 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requires including one or more MBE AND one or more WBE firms on the team). A VBE goal of 2 percent is applicable to the A/E team. The interviews for this project are tentatively scheduled for March 24, 2021. The method of Contractor Selection has not been Determined at this time.
Final Planning
Playgrounds / Parks / Athletic Fields
$6,500,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2024
I-70, Altamont, IL
Related To This Project
Altamont, IL
Bid Date: May 20 2022
Altamont, IL
Bid Date: May 20 2022
Altamont, IL
Bid Date: Jun 09 2022
Altamont, IL
Bid Date: Jun 09 2022
Altamont, IL
Bid Date: Jul 01 2022
Altamont, IL
Bid Date: Jul 26 2022
Altamont, IL
Bid Date: May 20 2022
Altamont, IL
Bid Date: Jun 27 2023
Altamont, IL
Bid Date: Oct 06 2022
Altamont, IL
Bid Date: Oct 17 2022
Decatur, IL
Bid Date: Nov 30 2022
Morton, IL
Bid Date: Dec 08 2022
Rockford, IL
--
Staunton, IL
Bid Date: Dec 15 2022
Elk Grove Village, IL
Bid Date: Dec 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.