BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Marshall, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project consists of: reconstruction and utility replacement on North 1st Street from East Main Street to West Marshall Street, on West Redwood Street from East College Drive to North 1st Street, and on West Marshall Street from East College Drive to North 1st Street; sanitary sewer, watermain, and storm sewer will be replaced. This project will also include new curb & gutter, new 5-ft. sidewalk on both sides of the streets, driveway aprons, water services, and sewer services to the right-of-way. Estimated quantities of major work items for the project are as follows: Type 9.5 Wearing Course Mix (3,c) 1,870 Ton Concrete Curb & Gutter Desgin B618 3,434 Lf Common Excavation (P) 3,233 Cy 10" Pvc Pipe Sewer 932 Lf 8" Pvc Pipe Sewer 429 Lf 6" Pvc Pipe Sewer 286 Lf 4" Concrete Walk 11,672 Sf 6" Concrete Walk 2,800 Sf 6" Concrete Driveway Pavement 585 Sy 10" Pvc Watermain 930 Lf 8" Pvc Watermain 405 Lf 6" Perf Pvc Pipe Drain 3,365 Lf No work can begin before April 19th and a Notice to Proceed. Substantial Completion must be achieved by October 1st. Questions regarding this Project, including any questions prior to bidding, shall be directed to Jessie Dehn, Assistant City Engineer at (507) 537-6773 or Jessie.Dehn@ci.marshall.mn.us. All bids shall be made electronically via online and shall be accompanied by a cash deposit, cashier's check, bid bond or certified check, payable to the order of the City for not less than 10% of the bid. The City Council reserves the right to reject any or all bids or any part of any bid, to waive minor defects, technicalities, or any informalities in the bidding or to advertise for new proposals, and to accept that bid deemed to be in the City's best interest. The bids and the responsibility of the bidders will be considered by the City Council at 5:30 P.M. on Tuesday, February 9, 2021, at the MERIT Center located at 1001 West Erie Road, Marshall, MN. No bidder may withdraw his bid for at least 90 days after the scheduled closing time for the receipt of bids

Award

Roads / Highways

$1,051,248.00

Public - City

Paving, Site Work

37

8

13

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
22
Bidding Soon
152
All Active Projects
80
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2021

February 11, 2021

img_map_placeholder

Multiple Locations, Marshall, MN


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.