Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2021 at 7:00 PM

Updated September 18, 2024

Renovation of an educational facility in Cumming, Georgia. Completed plans call for the renovation of a educational facility.

Please note FCS will allow a ten-minute grace period for attendance at this meeting. Any attendee not present in the meeting by 10:10 A.M. will forfeit their opportunity to participate in this proposal. Please keep in mind traffic, onsite parking, and vendor sign in when planning your attendance for this meeting. FCS desires work to be substantially completed within five weeks after job commencement. FCS may show preference to vendors that are able to complete work in this timeline. a) Specifications and drawings shall be a binding element of contract during solicitation and upon contract award between FCS and awarded contractor. b) Scope of Work and Specifications documents must be downloaded as attachment and shall be governing document regarding specifications and details. c) By submission of signed contract page as included with this Bid Document, the Bidder is agreeing to have read, understood, and is willing/able to comply with scope of work, specifications and drawings. d) Turn Key Project Contractor shall provide all equipment, tools, machinery, labor, parts and supplies to successfully perform the work herein and shall include engineered drawings, materials, equipment, installation, applicable taxes, and insurance as specified. e) Drawings All bidders shall download the drawing document associated with this bid. The drawings indicate all required work highlighted in red. a. Contractor will be responsible for removal and replacement of approximately 3450 of gutter, downspouts, all associated trim and accessories. The estimated 3450 of work will be indicated in red lines on the drawing document. b. Contractor will be responsible for field verifying all dimensions and existing conditions. A pre-bid conference on site will be required as a condition for bidding. c. Contractor shall as close as possible match all existing colors and profiles to maintain a consistent appearance with the existing building. d. All downspouts are to be connected to existing drain leaders with the appropriate connectors. e. Downspouts that drain out onto flat roof sections shall be extended, and provided with spreaders to prevent loss of roof aggregate.

Award

Educational

$94,700.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
144
Bidding Soon
2,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2021

March 26, 2021

Project location map

3645 Coal Mountain Dr, Cumming, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed