BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

This project includes the replacement of an existing MRI with a new machine (provided under separate contract) to meet the evolving mission of the clinic. The equipment replacement and upgrade are accompanied by a general renovation of the MRI room including new millwork and finishes, a revised ceiling plane, and construction of a penetration panel enclosure and cable management components within the room. Structural support and roof modifications are required to accept a vendor-furnished MRI chiller. Additional structural considerations will be required in the loading dock to accommodate the weight of the MRIs. There will be additional general conditions associated with working in the clinic because it will remain active during construction. Contractors will be required to adhere to the University's Infection Control Risk Assessment procedures requirements. Some specific tasks will be moved to afterhours schedules in order to lessen noise and vibration disruptions to the clinic - this will be addressed through an Owners Allowance. The mechanical scope includes revisions to the ventilation system within the MRI room as it relates to the architectural modifications as well as the emergency exhaust system. Additionally, two packaged air conditioning and heating units within the mechanical room will be replaced. The electrical scope includes revisions and upgrades to the convenience and lighting circuits within the MRI room and technician booth. Additionally, the electrical service for the new MRI equipment will be upgraded, the new mechanical equipment will require reconnection, and new equipment components will require service connections. This Project is located at: Outpatient Care Center (OCC) Suite 1A MRI #2 1801 W Taylor Street Chicago, IL The Owner reserves the right to reject any or all bids or any part thereof, to waive any informalities in the bidding, and to accept the bids deemed to be in the best interests of the Owner after all bids have been examined and evaluated. Alternates, if considered, will be accepted in any order as determined by the Owner.

Award

Medical

$308,794.00

Public - State/Provincial

Renovation

65

20

3

4

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
92
Bidding Soon
1,820
All Active Projects
798
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2021

April 14, 2021

img_map_placeholder

1801 W Taylor St, Chicago, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.