BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 3, 2021 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Holyoke, Massachusetts. Completed plans call for site work for a water / sewer project.

Phase 2A Water Replacement Project: Work includes approximately 6,700 linear feet of new 8-inch through 16-inch ductile iron water main, hydrants, service connections including trenchless service installation, and appurtenant work; Water service transfers; Roadway repairs. The work consists of providing approximately 6,500 feet of 8-inch through 16-inch diameter ductile iron water main, new valves, hydrants, and connections to intersecting streets. The work also includes reconnecting new water services from the old water main to be abandoned to the new water main, water service trenchless technology installation, existing water service transfers, abandonment of existing water main, and surface restoration. Bids shall be on a unit price basis, as indicated in the Bid Form. The Work will be substantially completed within 430 days from the date of the Notice to Proceed and completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions within 490 days from the date of the Notice to Proceed

Award

Water / Sewer

$2,091,504.00

Public - City

Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
611
Active Projects
230
Bidding Soon
4,590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2021

May 10, 2021

Project location map

600 Westfield Rd, Holyoke, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.