BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in San Rafael, California. Completed plans call for the renovation of a municipal facility.

As of 04/19/2021 Construction is anticipated to begin in May and completed by end of June/early July, pending on scheduling coordination with the contractor. The Project includes furnishing all labor, materials and equipment to remove and replace the standing seam metal roof and skylights at Central Marin Sanitation Agency's Administration Building, including disposal of removed roof, skylights, underlayment and gutters; installation of new underlayment and flashing; installation of beams and trellis for new skylights; repair of dry-rot areas; and all associated work as shown in the plans and specifications for this Project. A valid Class B California contractor's license is required to bid on the Project. Without invalidating the Contract and without notice to sureties or insurers, the Owner through the Construction Manager, may at any time or from time to time, order additions, deletions, or revisions in the Work; these will be authorized by field directive, field order, or change order. A change order will not be issued for a field directive unless the Construction Manager concurs with an appeal by the Contractor that such field directive is a change in the scope of the Contract. The Contractor shall comply promptly with the requirements for all change orders, field orders, or field directives. The work involved in change orders shall be executed under the applicable conditions and requirements of the Contract Documents. If any field order causes an increase or decrease in the Contract Amount or an extension or shortening of the Contract Time, an equitable adjustment will be made by issuing a change order as indicated in Section 01 03 50, MODIFICATION PROCEDURES. By the acceptance of a change order, the Contractor waives any claim for additional time, not included in the change order, for the work covered by that change order. Additional or extra work performed by the Contractor without written authorization of a field order or change order will not entitle the Contractor to an increase in the Contract Amount or an extension of the Contract Time.

Award

Municipal

$721,000.00

Public - County

Renovation

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
84
Bidding Soon
1,772
All Active Projects
652
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2021

May 3, 2021

img_map_placeholder

To Be Determined, San Rafael, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.