BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2021 at 8:00 PM

Updated February 7, 2025

Site work for a bridge / tunnel in Stillman Valley, Illinois. Completed plans call for site work for a bridge / tunnel.

The work included in this section is the extension of two (2) existing structures carrying Meridian Road over various drainage channels between School St and Sunbeam Court on the east side of Stillman Valley, IL. The northern structure is a single barrel (4'-0"W by 3'-0"H) reinforced concrete box culvert and will be extended 8'-6" west and 19'-0" east. The southern structure will have the 4'-0" by 4'-0" drop box on the west side of the structure extended vertically 2-0" to 4'-0". The Contractor shall be advised that their work shall be completed no later than May 31, 2021 to avoid conflicts with adjacent work. The successful bidder at the time of execution of the contract will be required to deposit a contract bond for the full amount of the award. When a contract bond is not required, the proposal guaranty check will be held in lieu thereof. If this proposal is accepted and the undersigned fails to execute a contract and contract bond as required, it is hereby agreed that the Bid Bond or check shall be forfeited to the Awarding Authority. The Awarding Authority reserves the right to waive technicalities and to reject any or all proposals as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals.

Award

Bridges / Tunnels

$26,050.00

Public - County

Site Work

10

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
283
Bidding Soon
3,368
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2021

April 5, 2021

Project location map

N Meridian Rd, Stillman Valley, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.