BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a warehouse / distribution facility in Orofino, Idaho. Working plans call for the construction of a 2,500-square-foot warehouse / distribution facility; and for site work for a warehouse / distribution facility.

The Idaho Department of Health and Welfare is proposing to construct a new storage building for the State Hospital North Facility, located in Orofino, Idaho. The storage building is anticipated to be constructed as a manufactured metal building set on a concrete perimeter footing. Building would be approximately 2,500 square feet, with main loading door and man door located on the north side of the building facing the parking lot. Building envelope to be fully insulated. Minimum tenant improvement build-out would include utility stub-ups for future staff office, staff restroom, and small conference room. The design for the future tenant improvement area will a part of this project. Interior floor area to be compacted gravel with the ability to install a concrete slab when tenant improvements are done. Demolition of the existing warehouse building on the site is included under this project scope. Questions that arise as a result of this Request for Qualifications should be addressed to: Brian Boyd, Project Manager Division of Public Works P.O. Box 83720 Boise, Idaho 83720 (208) 332-1914 Brian.Boyd@adm.idaho.gov The project will be funded by the State of Idaho. The Division of Public Works will administer the project according to the terms and conditions of the award and State laws and guidelines. The Design-Build team will receive general instructions through the State. A Project Manager of the Division of Public Works will be assigned to serve as project manager and liaison between the Agency and the Design-Build team. The Design-Builder is required to provide Programming, Schematic Design, Design Development, Construction Documents, and Construction Observation. The Design-Build team must have licensed design professionals and consultants, licensed to work in the State of Idaho, as required for pertinent design disciplines during the Design Phases and Construction Observation. This project will need to be routed through, and receive approval by, the Idaho Division of Building Safety (DBS). The Design-Build team shall make a minimum of one (1) presentation to the Permanent Building Fund Advisory Council and shall keep in mind that during all phases, code compliance, energy efficiency, and building maintenance concerns should be incorporated into the design. The Design-Build team will be required to meet monthly with the Project Manager for the purpose of providing a verbal report regarding the previous month's progress. Such monthly meetings will show funds expended in the completion of the project and specific accomplishments related to the completion of the project. The State will attempt to select a firm at the next scheduled Permanent Building Fund Advisory Council meeting. Upon selection of a firm, the State will issue a letter of intent. However, final award is contingent upon the successful negotiation of a contract. The contents of the proposal may be used in a legal contract or agreement. Proposers should be aware that methods and procedures proposed could become contractual obligations. The State reserves the right to reject any or all proposals received as a result of this request.

Pre-Construction/Negotiated

Warehouse / Distribution

$140,500.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
41
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2021

December 1, 2021

img_map_placeholder

300 Hospital Dr, Orofino, ID


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.