BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2021 at 8:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Combined Locks, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 15, 2021, the award amount is $700,556.15. The work consists of reconstructing Steven Street (Wallace Street to Jean Street) and Elm Street (S. Washington Street to Williams Street), including new concrete streets (currently asphalt), curb and gutter, driveway aprons, sidewalks and associated grass restoration. The project includes approximately 7,770 square yards of concrete street pavement, 196 tons of HMA pavement, 2,650 linear feet of concrete curb and gutter, 15,460 square feet of concrete driveway aprons, 18,780 square feet of concrete sidewalks and 3,515 square yards of grass restoration. An Alternate Bid is also included to reconstruct Prospect Street (currently asphalt) from the railroad tracks near Elm Street to the bridge east of park Street. The Alternate Bid includes approximately 8,935 square yards of concrete street pavement and miscellaneous sidewalk and curb & gutter replacement. Contract A | Steven Street & Elm Street Contract B | Prospect Street Bid-Result Contract A | Steven Street & Elm Street VINTON CONSTRUCTION COMPANY-$700,556.15 Contract B | Prospect Street VINTON CONSTRUCTION COMPANY-$409,431.40

Award

Roads / Highways

$700,556.00

Public - City

Paving, Site Work

50

14

4

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
42
Bidding Soon
624
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2021

April 14, 2021

Project location map

Multiple Locations, Combined Locks, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.