EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2021 at 7:00 PM

Updated September 18, 2023

Site work for a civil project in Pueblo, Colorado. Completed plans call for site work for a water / sewer project; and bridge / tunnel.

Questions are submitted online No Question Acceptance Deadline 03/08/2021 12:00 PM EST In general, this project will consist of installing 12,209 lineal feet of 8-inch and 2,014 lineal feet of 10-inch Ultraviolet Cured-In-Place Pipe, removing and replacing 267 lineal feet of 8-inch PVC pipe, reinstating 429 services, grouting 631 services up to 15 feet, and placing 348 vertical feet of epoxy coating in the attached manholes as detailed in the plans and specifications for this project. Past inspection videos are provided to review the existing conditions of the pipe and are available for viewing/download at the following link: https://cityofpueblo-my.sharepoint.com/:f:/g/personal/tasdelenm_pueblo_us/EghwhXc7CtxKod_fkIMjC9gBDo4sT-TmiPIulYl7joGbQQe=nm3KfF The undersigned, if awarded the contract, agrees to complete and file the Contract Agreement and Payment and Performance bonds within ten (10) days of the date of Notice of Award, and further agrees to complete the work within two hundred and ten (210) calendar days. Liquidated damages will be assessed in accordance with Section 3.54 of ARTICLE 3 - GENERAL PROVISIONS

Bid Results

Water / Sewer

$2,199,993.00

Public - City

Site Work

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
10
Bidding Soon
223
All Active Projects
88
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2021

May 10, 2021

img_map_placeholder

Multiple Locations, Pueblo, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.