BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 6, 2021 at 8:00 PM

Updated November 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Bremerton, Washington. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The WORK to be completed under this Contract consists of asphalt pavement repair, asphalt planing, pre-leveling, pavement reinforcement mesh, HMA pavement overlay, pavement markings, ADA ramps demolition and reconstruction, installation of new water main line with service connection, abandonment of existing water main, demolition of existing and installation of a new traffic signal with vehicle detection systems, pavement marking, and traffic control. The work must be physically completed within seventy (70) working days after the commencement date stated in the Notice to Proceed. All communications related to the project shall be directed to the City prior to opening of Bids: Chris Dimmitt, P.E., Telephone: (360) 473-2307, Email: Christopher.Dimmitt@ci.bremerton.wa.us Shane Weber, P.E., Telephone: (360) 473-2354, Email: Shane.Weber@ci.bremerton.wa.us Engineer's Estimate range for this project is $1,300,000 and $1,600,000. All work shall be performed in accordance with the Contract Plans, these Contract Provisions, and the WSDOT/APWA 2021 Standard Specifications. Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. The failure to furnish a bid deposit of a minimum of 5 percent shall make the bid nonresponsive and shall cause the bid to be rejected by the Contracting Agency. The successful bidder will also be required to provide a Performance Bond for 100 percent of the Contract Price. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton. A Disadvantaged Business Enterprise (DBE) mandatory goal of 16% has been established for this project with 0% for training. The 16% mandatory goal applies to all work on the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,704,900.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
52
Bidding Soon
1,743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2021

August 2, 2021

Project location map

6th St, Bremerton, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.