BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Lake Clarke Shores, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Job No: 92042.105 The Town of Lake Clarke Shores will be receiving sealed proposals from qualified contractors for the Pine Tree Lane Bridge Replacement Project in Lake Clarke Shores. This project will remove the current 2-lane approximately 40-foot-long bridge and replace it with a new 2-lane approximately 40-foot-long bridge as shown on the engineering plans designed by John Hoffman, Jr., Engenuity Group, and Alan Gerwig & Associates. Additional elements of this project include, but are not limited to, temporarily replacing an 8 water main, making improvements to the entry way for Pine Tree Park, replacing curbing, and coordination with FPL, Comcast and AT&T. Additional coordination with utility companies may be required. Proper care and caution will be critical throughout the construction process as this area has underground utilities such as fiber optics and a water main that runs the length of this project and serves residential customers. Bids must be accompanied by Bid Security. The amount of the security shall not be less than five (5) percent of the Bidders total price indicated in the Bid form. Public Construction Bond will be required after execution of the Contract with the selected proposer. The Town of Lake Clarke Shores reserves the right to reject any or all proposals, to waive technicalities, and to re-advertise. The award, if made, will be to the lowest responsive, responsible Proposer as determined solely by the Town. Question Deadline 02/27/2024 at 3:00 PM ET All questions regarding this Request for Proposal shall be directed in writing; by email to Dclark@Lakeclarke.org.

Bid Results

Bridges / Tunnels

$2,465,708.00

Public - City

Demolition, New Construction, Paving, Site Work

56

15

14

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
63
Bidding Soon
1,137
All Active Projects
484
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

June 15, 2024

img_map_placeholder

Pine Tree Ln, Lake Clarke Shores, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.