BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2021 at 8:00 PM

Updated February 20, 2025

Site work and paving for a mixed-use development in Saint James, Minnesota. Completed plans call for site work for a road / highway; for paving for a transportation facility; transportation facility; water / sewer project; and road / highway.

As of April 2 2021 project was not yet been awarded. No estimated time frame yet. This project provides for the reconstruction of bituminous hangar taxilane and access road pavements; and crack repair of bituminous runway pavements at the St. James Municipal Airport. Site work includes full depth reclamation of existing asphalt pavement; grading and drainage improvements; bituminous paving; bituminous crack sealing; bituminous mastic crack leveling; concrete valley gutter; erosion control and turf establishment. Approximate quantities of major items of work are as follows: Mobilization 1LS; Traffic Provisions 1LS; Sediment Control 1LS; Miscellaneous Removals 1LS; Full Depth Reclamation Recycled Asphalt Aggregate Base 5,510SY; Bituminous Pavement Crack Sealing 4,650LF; Bituminous Pavement Mastic Crack Leveling 4,750LF; Plant Mixed Asphalt Pavement 1,350TN; Pavement Markings 1LS; Turf Establishment 1LS; Concrete Valley Gutter 280LF No pre-bid meeting will be held

Post-Bid

Transportation Terminals

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
0
Bidding Soon
459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2021

June 1, 2021

Project location map

75751 Airport Ln, Saint James, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.