BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to a detention facility in Rapid City, South Dakota. Completed plans call for the renovation of a detention facility; for the demolition of a detention facility; for the construction of a detention facility; detention facility; and for the addition of a detention facility.

he scope of work comprises approximately 19,700 square feet of new construction for a new housing tower and almost 7,500 square feet of renovation within the existing Main Jail. The project includes the construction of up to 148 adult inmate beds for transitional housing, rec room space and the renovation of the existing Main Jail facility to include booths for the public to meet with inmates and perform court services via video visitation. The Main Jail will also have some of the infrastructure needs replaced including lateral sanitary sewer lines, security electronics and HVAC ventilation needs. Pre-construction services are anticipated to start immediately upon completion of the selection process within the Design Development phase and run through to construction start. It is anticipated that phasing of construction will be reviewed for viability and cost impacts during the pre-construction phase. Construction duration is estimated at approximately twenty-four (24) months with a completion date of April 2026 A complete request package can be received by contacting kevin.burton@pennco.org. Thank you for your interest. If you have any questions, please call the Pennington County Highway Department at 605-394-2166. The estimated total project budget which includes all associated project cost such as construction and soft cost for the Pennington County Jail expansion and renovation project is estimated between $28 million to $32 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Jails / Prisons

$32,000,000.00

Public - County

Addition, Demolition, New Construction, Renovation, Site Work

129

1

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
66
All Active Projects
24
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

August 5, 2024

img_map_placeholder

307 St Joseph St, Rapid City, SD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.