Site work for a water / sewer project in Eugene, Oregon. Conceptual plans call for site work for a water / sewer project.
Update: This project will assess and develop solutions to resolve existing drainage issues in the North Terry Street and Roosevelt Boulevard area caused by backwater conditions in the A3 Channel, Roosevelt Channel, and Greenhill Tributaries adjacent to the neighborhoods. This project supports the City of Eugene NPDES Municipal Stormwater Permit and Comprehensive Stormwater Management Plan by rehabilitating a portion of the municipal separate storm sewer system (MS4). Project is included City of Eugene Fiscal Year 2025-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: This project will assess and develop solutions to resolve existing drainage issues in the North Terry Street and Roosevelt Boulevard area caused by backwater conditions in the A3 Channel, Roosevelt Channel, and Greenhill Tributaries adjacent to the neighborhoods. This project supports the City of Eugene NPDES Municipal Stormwater Permit and Comprehensive Stormwater Management Plan by rehabilitating a portion of the municipal separate storm sewer system (MS4). Project is included in City of Eugene - Finance Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE : https://www.eugene-or.gov/ArchiveCenter/ViewFile/Item/6474 This Ward 8 project will assess and develop solutions to resolve existing drainage issues in the North Terry Street and Roosevelt Boulevard area caused by backwater conditions in the A3 Channel, Roosevelt Channel, and Greenhill Tributaries adjacent to the neighborhoods. Additional operations and maintenance costs are expected for this project, but it is too early in the project lifecycle to determine a reliable estimate. Project is in City of Eugene - FY 2023-2029 CIP 178 _____________________________________________________________________________________________________________________________ This project will assess and develop solutions to resolve existing drainage issues in the North Terry Street and Roosevelt Boulevard area caused by backwater conditions in the A3 Channel, Roosevelt Channel, and Greenhill Tributaries adjacent to the neighborhoods. As of September 29, 2021 no new CIP issued, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$300,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2029
N Terry St, Eugene, OR
Related To This Project
Eugene, OR
--
Eugene, OR
--
Eugene, OR
--
Eugene, OR
--
Eugene, OR
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.