Demolition, site work, renovation and addition to an educational facility in Lansing, Illinois. Completed plans call for the addition of a educational facility.

ADVERTISEMENT FOR CONSTRUCTION BIDS LEGAL NOTICE NOTICE IS HEREBY GIVEN by the Board of Education of School District 158 that sealed bids will be received for the Lester Crawl Primary Center Expansion/Renovation Project Phase 2 located at 18300 Greenbay Avenue, Lansing, Illinois, in the following bid categories: Bid Package 1 - Site Infrastructure. Said bids will be received up to the hour of 1:00 p.m. Central Time, Monday, April 12, 2021, at the office of School District 158, 18300 Greenbay Avenue, Lansing, Illinois 60438, and will be publicly opened and read aloud via a virtual bid opening immediately following that time. The bidding documents, which include drawings and specifications, are available electronically to bidders via the Architect's Procore site. Access can be obtained by calling the office of the Architect at 708-339-3900. The Architect has been authorized to refuse to issue plans and specifications and related bidding documents to any person, firm or corporation that the Architect considers to be unqualified. Proposals must be submitted on the forms provided. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the school board, cashiers check, or certified check made payable to School District 158 in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of the Board of Education of School District 158 for a period of sixty (60) days after the scheduled time of closing bids. APPLICABLE REQUIREMENTS All employees of the Contractor or Subcontractor(s) on construction work for this Project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Department of Labor in accordance with the applicable provisions of the "Wages of Employees on Public Works Act" (Prevailing Wage Act, Illinois Rev. Stat., 820 ILCS 130/1 et. seq.) and with all applicable provisions of the "Illinois Preference Act", 30 ILCS 570/.01 et. seq. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. The bonding company shall have a minimum rating of "B+9" in accordance with Best's Key Rating Guide - Latest Edition. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to School District 158 against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the School District 158. The Owner reserves the right to reject any and all proposals or bids. 3/30/21 6918455 This project titled "Lester Crawl Primary Center Renovation / Expansion Project Phase 2" consists of the following major elements: 1. One-story classroom addition with connections to existing building; 2. Select interior and exterior demolition, modifications of existing school; 3. Site infrastructure and utility improvements; 4. Related site work and re-grading as indicated; 5. All other work indicated on the drawings and in the project manual for this project. B. All work on this project will be awarded to multiple Prime Contractors.

Bid Results

Educational

$1,381,338.00

Public - City

Addition, Demolition, Renovation, Site Work

23

6

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
93
Bidding Soon
1,757
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2021

May 3, 2021

img_map_placeholder

18300 Greenbay Ave, Lansing, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.