Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2021 at 8:00 PM
Updated July 1, 2025
Renovation of a clubhouse / community center in Wheeling, West Virginia. Completed plans call for the renovation of a 4,500-square-foot clubhouse / community center.
The Owner may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No Bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Each bid must be submitted on the prescribed form and accompanied by Certification by Bidder Regarding Equal Employment Opportunity and Letter of Intent to Perform per the enclosed form. All blank spaces for bid prices must be filled in, in ink or typewritten, in both words and figures, and the foregoing Certifications must be fully completed and executed when submitted. Each bid must be submitted in a sealed envelope bearing on the outside the name of the Bidder, his/her address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. Bidder may bid one or a combination of projects listed. Each Bid Proposal will be reviewed, analyzed and awarded on an individual basis. Each bid must be accompanied by cash, certified check of the Bidder, or a bid bond as in the contract documents. The bid bond must be duly executed by the Bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 5% of each bid. Such cash, checks or bid bond will be returned to all except the three lowest Bidders within three (3) days after the opening of bids, and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted Bidder have executed the contract, or, if no award has been made within sixty (60) days after the date of the opening of bids, upon demand of the Bidder at anytime thereafter, so long as he/she has not been notified of the acceptance of his/her bid. Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the projects within ONE HUNDRED EIGHTY (180) CONSECUTIVE CALENDAR DAYS. Bidder must agree also to pay as liquidated damages, the sum of $100.00 for each consecutive calendar day of delay in achieving final completion
Award
Clubhouse / Community Centers
$1,520,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 10, 2021
June 9, 2021
99 Main St, Wheeling, WV
Related To This Project
Wheeling, WV
Bid Date: Jan 26 2021
Wheeling, WV
Bid Date: Jul 08 2025
Wheeling, WV
Bid Date: Mar 13 2019
Wheeling, WV
--
Wheeling, WV
Bid Date: Aug 07 2025
Wheeling, WV
Bid Date: Aug 14 2025
Wheeling, WV
--
Wheeling, WV
Bid Date: Sep 09 2025
Wheeling, WV
Bid Date: Jul 18 2025
Wheeling, WV
Bid Date: Jul 03 2025
Wheeling, WV
Bid Date: Jun 18 2025
Wheeling, WV
Bid Date: Jun 18 2025
Wheeling, WV
Bid Date: May 23 2025
Wheeling, WV
--
Wheeling, WV
Bid Date: May 06 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
