Published December 7, 2021 at 7:00 PM

Updated August 21, 2025

Renovation of a mixed-use development in Los Angeles, California. Completed plans call for the renovation of a 65,000-square-foot educational facility.

As of December 7, 2021, a general contractor has been awarded. A timeline for construction has yet to be established and information regarding subcontractor bidding opportunities has not been disclosed at this time. This Project is proposed by the David Geffen School of Medicine (DGSOM) Facilities Management to retrofit and install new fire sprinkler mains & heads in the corridors of the Center for Health Sciences (CHS), originally constructed in 1954 and consisting of approximately 65,000 asf. (1,050,000 gsf). The intent of this Project is to provide the capability to provide automatic fire sprinklers for existing and future research labs and other uses in the building. The DGSOM scope of work shall include the complete design and provision of fire sprinkler mains in corridors 2, 3, 8 and partial corridors 6 and 4 on floors 1-7 of CHS. These mains will connect to recently installed fire sprinkler risers in the building, and will allow for the connection of future fire sprinkler lines into individual spaces adjacent to the corridors, including research labs, instructional spaces and administrative suites. The new mains will be typically installed in the existing hard lid plenum above exiting corridors and connect to existing standpipes and riser assembly in Stairwells. Contractor shall develop a detailed project scope per location, including constructability, means and methods, and sequence of work based on conceptual documents provided and investigations performed during Phase 1. This will provide the automatic fire sprinkler capabilities in the existing corridors and the infrastructure to accommodate future fire protection needs and in support of the overall DGSOM program to connect existing and future Capital Projects requiring connection(s). The Public Health scope of work shall include provision a fire sprinkler riser and connections to the existing sprinkler system on the 7th floor of the School of Public Health. As part of Phase 1 services, CM/Contractor shall develop a deferred approval package by a California registered engineer for all Fire Protection work and submit package to University Representative for inclusion into Construction documents. University shall secure building permit. The entire project scope of work shall be performed in a fully operational and occupied building. All work performed Monday-Friday shall be performed at night. Work sequence shall be determined with input from University and User Groups. The University intends to take Beneficial Occupancy of project areas as work in those areas is completed. Contractor shall track all cost for the two scopes of work (DGSOM & Public Health) separately. The Anticipated Contract Value is $5,450,000.00. To join the meeting by internet, click on the link below: Meeting URL: https://ucla.zoom.us/j/94341559106 Meeting ID: 943 4155 9106 Join by telephone by dialing any one of the numbers below: +1 213 338 8477 US (Los Angeles) +1 602 753 0140 US (Phoenix) +1 346 248 7799 US (Houston) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York)

Award

Medical

$796,427.00

Public - State/Provincial

Renovation

50

23

2

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
3
Bidding Soon
2,065
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

February 7, 2022

Project location map

10833 Le Conte Ave, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.