Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 30, 2021 at 8:00 PM
Updated September 15, 2023
Site work and paving for a sidewalk / parking lot in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Harris County is soliciting bids for construction of sidewalk and bike lane at West Montgomery Road, TC Jester Boulevard and West Mount Houston Road for Precinct 1. The Sidewalk Improvements project will provide enhanced access to schools, neighborhoods, and transit stops. The project will provide pedestrian safety by addressing vehicle speeding issues and building facilities for individuals walking and biking on West Mount Houston Road, (6,883 LF), West Montgomery Road (6,514 LF), and TC Jester Boulevard (1,595 LF). The improvements consist of adding and improving sidewalks, and ADA accessible ramps. A bike path and shared use path will be designated along West Mount Houston Road from Bold Forest on the west end to W. Montgomery Road on the east. A shared use path will also extend along W. Montgomery Road from the Klein ISD school property to the Royal Mount Subdivision along TC Jester Boulevard. The proposed bike path is 7-ft wide and buffered by lane delineator dividers and the sidewalk ranges in width from 5-ft to 10-ft along the W. Mount Houston Road. The proposed project also includes three (3) Traffic Signal improvements that are located at the intersections of Antoine Drive and West Mount Houston Road, West Mount Houston Road and West Montgomery Road, and West Montgomery Road and Breen Drive.
Award
Sidewalks / Parking Lot
$2,330,725.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 10, 2021
June 9, 2021
Multiple Locations, Houston, TX
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
