BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a water / sewer project in Katy, Texas. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.

Construction of water, sanitary, drainage and paving facilities for Tamarron West Section 1. 16-inch x 45' restrained joint bend by One Bolt Inc. or approved equal Additional cost for 24-inch steel casing Flushing valve, bury as shown, (including lead and gate valve)Connect proposed 16-inch waterline to existing 16- inch waterline, including removal of existing 2-inch blow-off and 8-inch plug 2-inch blow-off and box 24-inch RCP, ASTM C-76, Class III, all depths 30-inch RCP, ASTM C-76, Class III, all depths, 48-inch RCP, ASTM C-76, Class III, all depths, 60-inch RCP, ASTM C-76, Class III, all depths Type "C" manhole for 48"-72" pipe, standard depth, The project is located in City of Fulshear ETJ, Fort Bend County, Texas (1) Make several parts fit properly. (2) Uncover work to provide for installation of ill-timed work. (3) Remove and replace defective work. (4) Remove and replace work not conforming to requirements of the contract documents. (5) Remove samples of installed work as specified for testing. (6) Install specified work in existing construction. Each bid must be accompanied by a certified or cashier's check (the "bid security") drawn on a responsible bank located in the State of Texas, for at least two percent (2%) of the total amount of the bid and made payable to Owner only. Bid Bonds for five percent (5%) of the maximum total bid amount are acceptable for construction contracts over $250,000. The successful bidder shall forfeit bid security to Owner as liquidated damages if it shall fail or refuse to enter into a proper contract for the Work, including failure or refusal to furnish the Performance and Maintenance Bond and the Payment Bond required by the Contract. Bid security will be returned to all but the three lowest bidders within three days after the Bid Opening Time, and the second and third lowest bidders may at that time substitute a bid bond by a qualified surety for the certified or cashier's check. Remaining bid security will be returned after execution of the Contract. The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of 60 days from the date bids are open.

Post-Bid

Water / Sewer

$700,000.00

Public - City

Paving, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
61
Bidding Soon
2,740
All Active Projects
1,063
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2021

June 3, 2021

img_map_placeholder

Multiple Locations, Katy, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.