BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Slippery Rock, Pennsylvania. Completed plans call for the renovation of a educational facility.

Requests for clarification are due Tuesday, May 11, 2021 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. Contract Cost Ranges: UP-451.1: $500,000 - $1,000,000 UP-451.4 $20,000 - $50,000 UP-451: Ash Silo and Related Equipment Replacement Slippery Rock University of the PA State System of Higher Education invites General and Electrical Contractors to download bid documents for this project. Work included under this Project at Slippery Rock University consists of the replacement of ash handling equipment located adjacent to and serving the Central Heating Plant of the Slippery Rock University upper campus. Work includes the replacement of the ash silo, ash conditioner, ash separators, dump box, and miscellaneous components associated with the ash handling equipment. Work includes the removal of all utilities servicing the existing equipment and replacement with new utilities associated with the new equipment. Modifications of the existing support structure includes removal and replacement of framing as needed for the support of the new equipment. The existing elevated enclosure modifications include the removal of existing enclosure and replacement with new insulated components. Enclosure modifications also include the replacement of the space heater, lighting, and electrical components. Work also includes the replacement of the existing catwalk, providing access from the heating plant roof to the silo, with a new catwalk, and lighting upgrades for the upper platform. Contractor shall provide all materials, labor, and testing necessary for a fully operational and commissioned system. Note: General Contractor's, refer to Bid Form and Section 013219 - Submittal Schedule for additional information required for the Bid. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the General (.1) Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents. Work included in each Separate Prime Contract shall include General Construction and Electrical Construction as contained in Section 011000 Summary and shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all construction identified on the Contract Documents to the satisfaction of, and subject to approval of the Professional and the University. Work included under this Project at Slippery Rock University consists of the replacement of ash handling equipment located adjacent to and serving the Central Heating Plant of the Slippery Rock University upper campus. Work includes the replacement of the ash silo, ash conditioner, ash separators, dump box, and miscellaneous components associated with the ash handling equipment. Work includes the removal of all utilities servicing the existing equipment and replacement with new utilities associated with the new equipment. Modifications of the existing support structure includes removal and replacement of framing as needed for the support of the new equipment. The existing elevated enclosure modifications include the removal of existing enclosure and replacement with new insulated components. Enclosure modifications also include the replacement of the space heater, lighting, and electrical components. Work also includes the replacement of the existing catwalk, providing access from the heating plant roof to the silo, with a new catwalk, and lighting upgrades for the upper platform. Contractor shall provide all materials, labor, and testing necessary for a fully operational and commissioned system. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the General (.1) Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents. Work included in each Separate Prime Contract shall include General Construction and Electrical Construction as contained in Section 011000 Summary and shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all construction identified on the Contract Documents to the satisfaction of, and subject to approval of the Professional and the University Bid Results:- General Contractor Simakas Company, Inc. $999,616 Electrical Right Electric, Inc. $64,444

Bid Results

Educational

$1,064,060.00

Public - State/Provincial

Renovation

38

20

5

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
45
Bidding Soon
917
All Active Projects
346
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2021

July 21, 2021

img_map_placeholder

1 Morrow Way, Slippery Rock, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.