Published May 21, 2021 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Slippery Rock, Pennsylvania. Completed plans call for the renovation of a educational facility.

Requests for clarification are due Tuesday, May 11, 2021 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. Contract Cost Ranges: UP-451.1: $500,000 - $1,000,000 UP-451.4 $20,000 - $50,000 UP-451: Ash Silo and Related Equipment Replacement Slippery Rock University of the PA State System of Higher Education invites General and Electrical Contractors to download bid documents for this project. Work included under this Project at Slippery Rock University consists of the replacement of ash handling equipment located adjacent to and serving the Central Heating Plant of the Slippery Rock University upper campus. Work includes the replacement of the ash silo, ash conditioner, ash separators, dump box, and miscellaneous components associated with the ash handling equipment. Work includes the removal of all utilities servicing the existing equipment and replacement with new utilities associated with the new equipment. Modifications of the existing support structure includes removal and replacement of framing as needed for the support of the new equipment. The existing elevated enclosure modifications include the removal of existing enclosure and replacement with new insulated components. Enclosure modifications also include the replacement of the space heater, lighting, and electrical components. Work also includes the replacement of the existing catwalk, providing access from the heating plant roof to the silo, with a new catwalk, and lighting upgrades for the upper platform. Contractor shall provide all materials, labor, and testing necessary for a fully operational and commissioned system. Note: General Contractor's, refer to Bid Form and Section 013219 - Submittal Schedule for additional information required for the Bid. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the General (.1) Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents. Work included in each Separate Prime Contract shall include General Construction and Electrical Construction as contained in Section 011000 Summary and shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all construction identified on the Contract Documents to the satisfaction of, and subject to approval of the Professional and the University. Work included under this Project at Slippery Rock University consists of the replacement of ash handling equipment located adjacent to and serving the Central Heating Plant of the Slippery Rock University upper campus. Work includes the replacement of the ash silo, ash conditioner, ash separators, dump box, and miscellaneous components associated with the ash handling equipment. Work includes the removal of all utilities servicing the existing equipment and replacement with new utilities associated with the new equipment. Modifications of the existing support structure includes removal and replacement of framing as needed for the support of the new equipment. The existing elevated enclosure modifications include the removal of existing enclosure and replacement with new insulated components. Enclosure modifications also include the replacement of the space heater, lighting, and electrical components. Work also includes the replacement of the existing catwalk, providing access from the heating plant roof to the silo, with a new catwalk, and lighting upgrades for the upper platform. Contractor shall provide all materials, labor, and testing necessary for a fully operational and commissioned system. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the General (.1) Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents. Work included in each Separate Prime Contract shall include General Construction and Electrical Construction as contained in Section 011000 Summary and shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all construction identified on the Contract Documents to the satisfaction of, and subject to approval of the Professional and the University Bid Results:- General Contractor Simakas Company, Inc. $999,616 Electrical Right Electric, Inc. $64,444

Bid Results

Educational

$1,064,060.00

Public - State/Provincial

Renovation

38

20

5

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
110
Bidding Soon
1,129
All Active Projects
536
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2021

July 21, 2021

img_map_placeholder

1 Morrow Way, Slippery Rock, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ash Silo and Related Equipment Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.