Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2021 at 8:00 PM

Updated April 26, 2025

Site work and paving for a road / highway in Stockertown, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work will include, but will not necessarily be limited to, providing all equipment, materials, labor, supervision, and testing services to mill, overlay and provide full depth road repairs as further described in the bid documents. Each proposal shall be accompanied by a Bid Bond in the required form, certified check, bank cashier's check, or other security acceptable, to the Owner in the amount of 10% of the total Base Bid. Bids will be effective for 60 calendar days from the Bid opening date except as permitted by law, and may not be withdrawn during this period. Bidders must Bid on all items listed on the Bid Form. All Bidders are required to establish proof of competency and responsibility, in accordance with 67 PA Code Chapter 457, Regulations Governing Pre-qualification of Prospective Bidders and PennDOT Form 408/2011, as supplemented and amended, Section 102. Subcontractors must prequalify in the same manner, if listed in the proposal or if Bidder subsequently undertakes the partial or total construction of one or more items of work. All Bidders and Subcontractors must be PennDOT pre-qualified. Liquidated damages apply at the rate of $500.00 per calendar day. Proposals must be upon the forms furnished by the Municipality. For third class cities the bid must be accompanied by a certified check or bid bond in the amount of 10 % of the bid, made payable to the municipality. For other municipal types it is the discretion of the municipality. The successful bidder must provide a 100% Performance Bond and a 100% Payment Bond within 10 days of the award of the contract. - The Contractor shall provide a 100% Maintenance Bond of the final adjusted contract sum to guarantee all work and materials for a period of twelve (12) months starting from the date of the OWNER Work schedule must be coordinated with the Municipality and must be completed by July 1, 2021. The Municipality reserves the right to reject any or all proposals. CLARIFICATION DEADLINE 5/5/2021 12:00 PM

Award

Roads / Highways

$237,236.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,065
Active Projects
398
Bidding Soon
7,079
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2021

July 12, 2021

Project location map

Multiple Locations, Stockertown, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed