BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2021 at 8:00 PM

Updated January 8, 2026

Site work and new construction of a swimming pool in Waxahachie, Texas. Completed plans call for the construction of a 2,739-square-foot swimming pool.

Scope of work includes the new construction of a bathhouse and pool. As of May 11, 2021 applications have been filed with the Texas Department of Licensing and Regulation. An architect has been selected. Construction could begin in the third quarter, 2021. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. furnishing all labor, material and equipment, and performing all work required to demolish and existing swimming pool and bathhouse and construct a new 2,800 sq. ft. bathhouse and a new 3,900 sq. ft. recreational swimming pool with in-pool water features and fountains, commercial fiberglass waterslide, and associated equipment and amenities. he successful bidder must furnish a Performance bond, a Material and Labor Payment Bond, all upon the form provided in the amount of 100 percent of the contract price, and a 2-year Maintenance Bond provided in the amount of 30% of the contract price, from an approved surety company holding a permit from the State of Texas to act as surety or other sureties acceptable to the Owner The work to be performed under this contract consists of furnishing all materials, labor, supervision, tools, equipment and all incidentals required & performing all work necessary for the Lee Penn Park Swimming Pool and Bathhouse Project. The project includes selective demolition of existing site structures including the existing bathhouse building, existing swimming pool, and some existing utilities. The project also includes the installation of new utilities, construction of a new bathhouse building, construction of a new swimming pool and concrete pool decks, and installation of new picket fencing around the pool yard. Additional features to be constructed/installed at the project include shade structures, waterslide, and various waterplay features in the shallow areas of the pool.

Award

Swimming Pools

$2,623,735.00

Public - City

New Construction, Site Work

57

23

4

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
23
Bidding Soon
2,991
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2021

September 16, 2021

Project location map

400 N Getzendaner St, Waxahachie, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.