BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 20, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Dayton, Nevada. Completed plans call for site work for a water / sewer project.

This project includes the rehabilitation of two (1MG and 40,000-gallon) welded steel water storage tanks near US Highway 50 in Dayton, Nevada. The Dayton Upper Tank (1MG) rehab will consist of an exterior and interior coating along with component additions and improvements including a new interior ladder, new vents, a new sample tap and cathodic protection. The Upper Tank will also include the replacement of an existing FDC with a new fire hydrant. The Lower Tank (40k) will require the exterior coating only along with the exterior components of the tank. The Contractor will have 75 calendar days to complete the Work in compliance with all applicable laws and regulations. The Engineer's Opinion of Probable Construction Costs of the project is between $600,000 to $800,000. For questions regarding this project, and for complete contract requirements, contact: Keith Karpstein, P.E.; (775) 284-7898; Farr West Engineering; 5510 Longley Lane; Reno, Nevada 89511; kkarpstein@farrwestengineering.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$292,140.00

Public - County

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
0
Bidding Soon
204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2021

September 1, 2021

Project location map

Multiple Locations, Dayton, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.