Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Hillsboro, Oregon. Completed plans call for the renovation of a 1,000-square-foot municipal facility.
Washington County Facilities and Park Services is seeking a Contractor to provide reception area upgrades for the Harkins House Juvenile Shelter. The project includes approximately 50 linear feet of an updated reception area in two segments. Includes an elegant glass wall, new finishes, non-structural walls, new interior doors, and new acoustic panels. Total project area is approximately 1,000 sf Address is 244 W Main Street in Hillsboro, OR. Building was constructed in 2000. Architect for this project is Scott Edwards Architects The estimated expense for this contract will be $200,000-$250.000. The project scope includes the removal and replacement of the reception counter and transaction glass. New ceiling mounted acoustical panels will be installed, and all new work shall include the transitions and patching required at all existing walls, floors and ceilings to remain. The Work includesthe furnishing of labor, materials, and equipment for the construction of all work as described in the Drawings and Project Manual including, but not limited to general construction, HVAC, plumbing, electrical, fire protection systems, and installation of all owner furnished/contractor installed items. B. The Contractor's scope of work shall include all permits, licenses, labor, materials, equipment, and related expenses necessary to complete the Project to the satisfaction of the Owner, the Architect, all governmental agencies having jurisdiction, and all Utilities serving the Project except: 1. The Owner or his representative will file the General Building Construction Documents with the required building department and pay for their plans review and the General Building permit and General Systems development assessments. a. General Systems assessments refers to jurisdictional charges levied to a project for general community development and not related to work specific to the project site. Project specific Work or fees such as water meter fees, tap fees, utility extensions, road improvements or other similar work, required by the jurisdiction or serving utility, are the responsibility of the Contractor under this Contract. b. All sub-trade plans review and permit fees are the responsibility of the Contractor under this Contract. 2. Work identified on the Drawings that is to be by Owner. C. All project work as outlined in the Contract Documents, which includes but is not limited to general construction and coordination with installation of all owner furnished items as specified in this Section. D. On all Bidder Designed work, the Contractor shall provide complete design and documentation as required for submission to and approval of Architect, Governing Building Departments or Other Authorities having jurisdiction, and Owner. Refer to Section 01 33 50 of the attached specifications. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $200,000-$250.000
Award
Municipal
$138,130.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2021
September 6, 2021
244 W Main St, Hillsboro, OR
Related To This Project
Hillsboro, OR
Bid Date: Mar 04 2021
Hillsboro, OR
Bid Date: Jan 14 2021
Hillsboro, OR
Bid Date: Oct 01 2020
Hillsboro, OR
Bid Date: Sep 22 2020
Hillsboro, OR
Bid Date: Oct 12 2023
Hillsboro, OR
Bid Date: Oct 19 2023
Hillsboro, OR
Bid Date: May 28 2020
Hillsboro, OR
Bid Date: Sep 16 2021
Hillsboro, OR
Bid Date: Jan 26 2022
Hillsboro, OR
Bid Date: Sep 30 2022
Hillsboro, OR
Bid Date: Jul 15 2020
Hillsboro, OR
Bid Date: Nov 23 2021
Hillsboro, OR
Bid Date: May 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.