BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Ocala, Florida. Completed plans call for the renovation of a 1,280-square-foot residential development.

This project consists of construction improvements to site built home, located at: 14 Spring Loop, Ocala, FL 34472. Square footage under the roof is 1,280. TERM: 60 days to Substantial Completion + 7 days to Final Completion Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. Marion County believes that hiring done through this contract should, to the maximum extent, be offered to citizens within its boundaries that are unemployed or seeking work for the first time. To that extent, the firm awarded business under this contract will be contacted by the Workforce Connection, our regional workforce development board, to discuss hiring through its staff and services. Your participation with Workforce Connection is not required as a condition of award, but rather an opportunity for greater support for the community and your firm in hiring assistance. Local (Marion County) Businesses are encouraged to sign up for the Local Business Directory to be included in more vendor opportunities - call 352/671-8444 to inquire about the program! For questions relating to this solicitation, contact: Anette Francia anette.francia@marionfl.org CONTRACTOR agrees to furnish all labor, materials, tools, equipment, permits, licenses and services for the proper repairof the above identified Property in accordance with the specifications and requirements for this Project and per current codes of the Marion County Building Department. CONTRACTOR agrees that all materials supplied are guaranteed to be as specified. Substantial Completion shall be achieved within sixty (60) calendar days and an additional fourteen (14) days shall be allowed for final completion including punch list items. Substantial Completion is the state in the progress of the Work when the Work is sufficiently complete in accordance with the Contract Documents so that the Work can be occupied and utilized for its intended use. The number of calendar days from the date of the Notice to Proceed throughthe date set forth for substantial completion shall constitute the "Term". All Work shall be completed in a workmanlike manner according to standard practices. The Property shall remain HOMEOWNER occupied during construction Contractor responsible for all measurements, roof square footage and quantities for all roofing materials required to complete roof replacement. - Shingle color to be selected by Owner. - Contractor to notify Construction Coordinator two working days in advance of roof tear off date. - Prior to dry-in decking, truss repair and wood fascia must be inspected by Construction Coordinator. - Roofing Contractor and employees must use extreme caution while working around electrically charged wires to existing weather-head. Contractor and Subcontractors are responsible for providing safety training for all employees and trades while conducting work activities related to this project. - Remove all existing shingles and underlayment down to roof decking. - Contractor to remove gutters carefully and reinstall existing gutters when roof is complete. Note: This only applies to existing gutters. - Re-nail existing sheathing per code specifications. - Furnish and install approximately fifteen (15) sheets of plywood decking for repairs. - Furnish and install Felt Buster(R) high traction synthetic roofing underlayment properly nailed per code. - Furnish and install three (3) new code compliant roof plumbing vent stacks. Apply roofing tar and fasteners, per manufacturer instructions. - Furnish and install new like-for-like kitchen and bathroom universal roof cap vents. Apply roofing tar and fasteners, per manufacturer instructions. - Furnish and install new pipe flashing boot around existing furnace exhaust mounted through roof. Apply roofing tar and fasteners, per manufacturer instructions. - Remove and reinstall existing satellite dish and bracket. This includes the removal and reinstallation of the satellite CATV wires secured to the existing fascia when the fascia replacement is performed. - Remove all water damaged wood fascia around home as needed. Note: (Const. Coordinatormust inspect repair before covering.) - Furnish and install ten (10) (2-inch-thick x 4-inch-wide x 16 feet long) of pressure treated lumber to replace rotten framing, behind finished fascia. Note: (Const. Coordinator must inspect repair before covering.) - Furnish and install six (6) (1-inch-thick x 6-inch-wide x 16 feet long) of pressure treated lumber to replace rotten fascia on the home. Note: (Const. Coordinator must inspect repair before covering.) - Furnish and install eight (8) (2-inch-thick x 4-inch-wide x 10 feet) same species of lumber to replace rotten truss tails. Note: (Const. Coordinator must inspect repair before covering.) - Furnish and install new GAF(R) plastic cobra ridge vent with matching shingles installed on top surface, per Building Code and Manufacturer specifications. - Furnish and install new aluminum drip edge to cover entire roof perimeter per Building Code and Manufacturer specifications. Drip edge to be the color white. - Furnish and install new aluminum fascia to cover entire roof perimeter fascia per Building Code and Manufacturer specifications. Aluminum fascia color to be white. - Furnish and install 30-year architectural/dimensional shingles for entire roof area. Provide warranty information. - During roof rafter and fascia repairs, wood soffits, vents and trim pieces may become loose and come apart. Contractor to reinstall all loose vents, trim pieces and soffit sections around entire home, as needed. All soffits damaged during construction are the Contractors responsibility to furnish and install to original condition. - Furnish and install 30-year architectural/dimensional shingles for entire roof area. Provide warranty information. - Contractor to spread tarps along the base of home to protect shrubs and catch roofing debris during demo. Contractor thoroughly clean-up roof debris to exterior of home and use rolling magnet device to pick-up nails, when roof replacement is completed. LAST DAY FOR QUESTIONS: June 24, 2021, 12:00PM

Award

Residential Subdivision

$12,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
151
Bidding Soon
2,322
All Active Projects
930
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 1, 2021

August 2, 2021

October 8, 2021

img_map_placeholder

14 Spring Loop, Ocala, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.