EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Jacksonville, Illinois. Working plans call for the renovation of a educational facility.

Project has canceled This project is Phase 1 of the replacement of building automation system, packaged air cooled chillers and partial HVAC systems. General under $ 400,000 Heating under $ 2,000,000 Electrical under $ 400,000 CDB bid envelopes can be used to mail bid documents to CDB Springfield if bidding firms have access to them. Otherwise, the CDB Project Number, the Trade, and the Bid Date should be included on the outside of the mailing envelope. Bids can be sent via the US Post Office, UPS, or FEDEX, and should be sent without a signature required at delivery. Mailed bids will be considered on-time if the package is in CDBs mail received on, or before, the THURSDAY morning following the bid receipt deadline. No confirmation of delivery will be provided to the contractor by CDB. Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable 4 % MBE/WBE, 0% PBE/VBE. DESCRIPTION: Five ISD Buildings are included in this phase of the project. 1. Wait Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 2. Vocational Building - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 3. Officer Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 4. Physical Plant - This work will include, but is not limited to, upgrading the existing BAS file server and software to provide electronic communication to and from the new BAS in the listed building above. It will also include integrating the new BAS from the buildings listed. 5. Cullom Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled package chiller and chilled water pumps, fan coil units and appurtenances. Substantial Completion - 196 consecutive calendar days + final completion- 30 consecutive calendar days from the date of Substantial Completion.

Final Planning

Educational

$2,800,000.00

Public - State/Provincial

Renovation

76

14

24

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Rigid Paving, Concrete Paving, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
52
Bidding Soon
639
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

April 17, 2023

img_map_placeholder

125 S Webster Ave, Jacksonville, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Install New A/C Units and New Building Automation Systems

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.