Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Jacksonville, Illinois. Working plans call for the renovation of a educational facility.
Project has canceled This project is Phase 1 of the replacement of building automation system, packaged air cooled chillers and partial HVAC systems. General under $ 400,000 Heating under $ 2,000,000 Electrical under $ 400,000 CDB bid envelopes can be used to mail bid documents to CDB Springfield if bidding firms have access to them. Otherwise, the CDB Project Number, the Trade, and the Bid Date should be included on the outside of the mailing envelope. Bids can be sent via the US Post Office, UPS, or FEDEX, and should be sent without a signature required at delivery. Mailed bids will be considered on-time if the package is in CDBs mail received on, or before, the THURSDAY morning following the bid receipt deadline. No confirmation of delivery will be provided to the contractor by CDB. Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable 4 % MBE/WBE, 0% PBE/VBE. DESCRIPTION: Five ISD Buildings are included in this phase of the project. 1. Wait Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 2. Vocational Building - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 3. Officer Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled split system chiller and chilled water pumps and appurtenances. 4. Physical Plant - This work will include, but is not limited to, upgrading the existing BAS file server and software to provide electronic communication to and from the new BAS in the listed building above. It will also include integrating the new BAS from the buildings listed. 5. Cullom Hall - The work will include, but is not limited to, replacing existing controls with a BAS linked to the Physical Plant BAS server and workstation. It will also include replacing the air cooled package chiller and chilled water pumps, fan coil units and appurtenances. Substantial Completion - 196 consecutive calendar days + final completion- 30 consecutive calendar days from the date of Substantial Completion.
Final Planning
Educational
$2,800,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2023
April 17, 2023
125 S Webster Ave, Jacksonville, IL
Related To This Project
Jacksonville, IL
Bid Date: Dec 14 2022
Jacksonville, IL
Bid Date: Jan 20 2023
Jacksonville, IL
Bid Date: Feb 15 2022
Jacksonville, IL
Bid Date: Apr 28 2023
Jacksonville, IL
Bid Date: Jan 10 2023
Jacksonville, IL
Bid Date: Apr 19 2022
Jacksonville, IL
Bid Date: Apr 20 2022
Jacksonville, IL
Bid Date: Mar 30 2022
Jacksonville, IL
Bid Date: Dec 07 2022
Jacksonville, IL
Bid Date: Nov 17 2022
Jacksonville, IL
--
Jacksonville, IL
Bid Date: Oct 31 2022
Jacksonville, IL
Bid Date: Nov 18 2022
Jacksonville, IL
Bid Date: Oct 14 2022
Jacksonville, IL
Bid Date: Nov 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.