Demolition, site work, renovation and addition to a mixed-use development in Milford, Iowa. Working plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and theater / auditorium.

All bids over budget and rejected by school board The Work of the Project is defined by the Contract Documents and consists of the following : Expansion of the cafeteria, remodel of the kitchen, fire alarm replacement, multi-purpose room addition, replacement of auditorium equipment. Bids will be received for the following : General Contract, including Architectural, Structural, Mechanical, Electrical, Technology, and Civil . Each Bid shall be made on a form furnished by the Architect , and must be accompanied by a certified check or cashier's check drawn on an lowa bank, or Bid Bond to be executed by corporation authorized to contract as a surety in the State of lowa , in the amount equal to five percent (5%) of the amount of the Bid, made payable to the Okoboji Community School District , Milford , IA and may be cashed by the District as liquidated damages in the event that the successful bidder fails to enter into a Contract and file a bond satisfactory to the District assuring the faithful fulfillment of the Contract and maintenance of said improvements as required by the law, the provisions of this Notice and Contract Documents within (10) days after acceptance of the lowest responsive, responsible bid. All bids shall be sealed and plainly marked. Any alteration of the Bid Form may be cause for rejection of the bid. |The successful Bidder will be required to furnish a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the Contract Sum, issued by a responsible Surety approved by the District and shall guarantee the faithful performance of the Contract and terms and conditions therein contained and the maintenance of said improvements pursuant to the provisions of the Contract Document. Bid Security shall be made payable to Okoboji Community School District , Milford , 1A . Bid Security of two lowest Bidders will be retained until a contract has been awarded and executed, but no longer than 45 days. No Bidder may withdraw their bid within 30 days after opening of bids. The work under the Contract shall be commenced on or before a date to be specified in the Contract or written Notice to Proceed of the Owner, and shall achieve Substantial Completion by 08-03-2022. MBI plan deposit cards are also an acceptable method for deposit for documents. When shipping/postage is required, there will be a $20 non-refundable fee for each set of Bid Documents shipped. Deposit checks shall be made payable to FEH DESIGN. Postage checks shall be made payable to Beeline & Blue. Okoboji Community School District , reserves the right to reject any and all bids, re-advertise for new bids, and to waive informalities that may be in the best interest of Okoboji Community School District . As of June 1, 2022, no rebid information available at this time

Final Planning

Educational

$6,420,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Membrane Roofing, Elastomeric Membrane Roofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Traffic Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Static-Control Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Toilet Compartments, Plastic Toilet Compartments, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
175
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2021

March 27, 2023

img_map_placeholder

901 H Ave, Milford, IA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Okoboji Commons & Multi-Purpose Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.