BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2021 at 8:00 PM

Updated April 25, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Bethel, Alaska. Completed plans call for the construction of a 53,640-square-foot educational facility; for site work for a sidewalk / parking lot; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

- The abatement and demolition of existing site boardwalks, connexs, site utilities, small housing structure and miscellaneous site debris, - The procurement and installation of piles related to the construction of an approximately 53,640 gsf new school and identified adjacent support buildings - generally identified as package 1A. - The procurement and installation of piles related to the construction of the foundation for a campus wide fire pump house generally identified as package 1B also identified as add alternate #1. - Final grading for a designated area including all areas under the building footprint and other pile foundations. - Project coordination with adjacent construction projects, including, but not limited to: DOT Ridgecrest Improvements, LKSD Infrastructure Improvement Projects at the LKSD Campus, City of Bethel and AVEC line extension, - The relocation of the construction excavation fill to location(s) on the LKSD Main Campus site and designated storage locations, - SWPP development and maintenance for all areas of excavation and fill. - Seeding and plantings for soil stabilization and provision of additional soil stabilization methods as indicated. - Temporary connection for continued use of exterior crosswalk lighting. - Access coordination for the adjacent LKSD Campus Facilities that will be in use during construction, including parking, bus routes and pedestrian connectivity. - Provisions for the security of the construction site including fencing to become property of the owner for continuation of construction activities after the work of this contract is completed. All questions must be submitted via email to karenz@ecialaska.com AND ryan_jeffries@lksd.org Questions will be received up until 5:00PM AKST, June 18, 2021.

Award

Educational

$4,226,600.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
4
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2021

August 23, 2021

Project location map

To Be Determined, Bethel, AK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.