BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2021 at 8:00 PM

Updated March 4, 2026

Site work, outdoor lighting and renovation of a civil project in Russell, Kentucky. Completed plans call for site work for a water / sewer project; for outdoor lighting for a water / sewer project; and for the renovation of a water / sewer project.

Contract 1: Award to McGinnis, Inc. $147,000. Contract 2: Award to Dixon Electrical Systems & Contracting , Inc. $66,700. The scope of work involves two separate contracts necessary to support the citys work in the implementation of a temporary raw water intake facility to replace the existing intake structure on the ohio river. The city intends to self-perform some of the work elements such as concrete anchors and underground piping, but wishes to procure services for the fabrication of the new facility and for electrical contracting. Fabrication contract: this work will involve the work necessary to transport a boat dock and catwalk recently purchased by the city to the site and make modifications necessary to place it into service as a new pump station. The work required is generally shown on drawings prepared by banks engineering. In general, the fabrication portion of the work will involve the following elements: 1. Transporting the boat ramp and catwalk from its current location in south point, ohio to the site and anchoring the facilities in place as shown on the drawings. 2. Prior to placement in the river, conduct surface preparation and painting of the boat ramp and catwalk. Install conduit and replace the catwalk decking along with other modifications shown on the drawings. 3. Procurement and installation of the boat ramp pumping and piping equipment including the pumps, valves, railings, and piping shown on the drawings. This work will end on the riverbank where the piping goes underground, where city crews will complete the underground piping and connections. Electrical contract: the work will involve modifications to the existing electrical building and installation of electrical equipment and materials for the new pumping station on the boat ramp. As generally shown on drawings prepared by banks engineering, the electrical portion of the work will involve the following elements: 1. Procurement and installation of conduit, wiring, and all appurtenances necessary to extend electrical service from the existing electrical building to the proposed pumps and lighting on a boat dock provided by others. Installation of lights meeting coast guard navigation requirements and to provide lights for night time maintenance work is included in this task. 2. Modifications to the existing control panels and related equipment in the electrical building. 3. Procurement and installation of variable frequency drives (vfds) in the existing electrical building. The instructions to bidders, bid form, agreement forms, performance and payment bonds, plans, and other contract documents may be examined at the following locations:russell city hall 410 ferry street russell, kentucky, 41169 phone (606) 836-9666, banks engineering, inc. 1211 jessamine station nicholasville, ky 40356 (859) 881-0020 The owner reserves the right to waive any informality or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the instructions to bidders.

Award

Water / Sewer

$213,700.00

Public - City

Outdoor Lighting, Renovation, Site Work

6

6

26

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
62
Bidding Soon
592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2021

August 30, 2021

Project location map

To Be Determined, Russell, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.