BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of a detention facility in Lapeer, Michigan. Completed plans call for the renovation of a detention facility.

Provide a new fire alarm system for the correctional facility. The scope of work includes, but it's not limited to, the provision of a new system and devices, as well as the demolition of the existing system and its associated devices, wires, and equipment in all buildings. Conduits may be reused if recessed in walls but shall be replaced in exposed areas or as required. If any underground work is required, the contractor shall provide a GPR report before commencing any work. ACCEPTING QUESTIONS UNTIL: March 15, 2022 @ 5:00 pm

Bid Results

Jails / Prisons

$897,505.00

Public - City

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
139
Bidding Soon
2,257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

April 22, 2022

Project location map

3225 John Conley Dr, Lapeer, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.