Published May 12, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Lapeer, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The progress schedule submittal must include, as a minimum, the controlling work items for the completion of the project and the planned dates or work days that the work items will be the controlling operations. All contract dates including open to traffic, project completion, interim completion and any other controlling dates in the contract must be included in the progress schedule. After receiving Notice of Award, start work on or before the date approved by the Engineer. In no case, may any work be commenced prior to receipt of formal notice of award by Lapeer CRC. Once work begins Contractor shall complete all contract work within 6 weeks from start of Project or approved by Engineer. All locations must be completed on or before the final project completion date of August 30, 2022 Failure by the Contractor to meet final and/or any open to traffic dates will result in the assessment of liquidated damages. Unless specific pay items are provided in the contract any extra costs incurred by the Contractor due to cold-weather protection, winter grading, sufficient manpower and equipment necessary to maintain the schedule, and/or meet the final completion date, and any overtime will not be paid for separately, but will be included in payment of other contract items. No extensions of time will be allowed for increases in contract quantities or extra work, until it can be shown that such increases or extras affect the critical item of work. No extension of time will be granted for labor disputes, unless it can be shown that such disputes are industry wide and that the delay affects the critical item of work. No extension of time will be granted as a result of work stoppages ordered by Lapeer County Road Commission for Contractor non-compliance. No extensions of time will be granted for delays in delivery of critical materials, unless the delay can be shown to be industry wide and the delay affects the critical item of work. After award and prior to the start of work, the Contractor must attend a preconstruction meeting with the Engineer. The Engineer will determine the day, time and place for the preconstruction meeting. The meeting will be conducted after project award.

Post-Bid

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
165
Bidding Soon
2,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

April 29, 2022

Project location map

Multiple Locations, Lapeer, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.