BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Bowling Green, Ohio. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

In general, the work consists of replacement of the District's Ford Road Pump Station. The new pump station will be a submersible style station along with utility and sitework improvements. Technical questions regarding the project should be e-mailed to the Project Manager Theodore Bennett, P.E. at tbennett@jheng.com at Jones and Henry Engineers, Ltd. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by either a Bid Guaranty and Contract Bond in the amount of 100% of the amount bid with satisfactory corporate surety, or by a certified check on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid. The Contractor shall be required to pay not less than the prevailing wage rates established by the federal Davis-Bacon Wage Determinations issued by the U.S. Department of Labor. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 90 days after the actual opening thereof. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner. This procurement is partially funded through loan and grant from the Ohio EPA DEFA WPCLF and the Ohio Public Works Commission. All questions shall be submitted by no later than September 9, 2021 at 11:00 AM. The Engineer's Opinion Construction Cost for the proposed base bid project is $6,600,000 to 6,900,000.

Award

Water / Sewer

$7,715,000.00

Public - State/Provincial

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
61
Bidding Soon
1,076
All Active Projects
416
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

June 6, 2022

img_map_placeholder

Fort Dr, Bowling Green, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.