BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Hudson, Illinois. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

**As of April 04, 2023, this project has not yet been awarded. A timeline for award has not yet been established.**  New Lake Bloomington Maintenance Facility The City of Bloomington reserves the right to reject any and all bids and to waive technicalities. Project Identification: Oakton Community College, community College Cannabis Vocational Pilot Program. The City of Bloomington requires all Bidders/Consultants doing business with the City not to discriminate on the basis of race, age, color, religion, gender, ancestry, national origin, marital status, mental or physical disability unrelated to ability, familial status or sexual orientation. All questions related to this Invitation to bid (ITB) shall be submitted in writing through the ProcureNow Question/Answer Tab via the City's e-Procurement portal, on or before, Monday, February 13, 2023 by 12:00 pm. Bid must be accompanied by a Bid guaranty which shall not be less than ten percent (10%) of the amount of the Bid. Bid guaranty may be a cashier's check, money order, certified bank check, or a surety bond. All guaranties, except surety bonds, will be deposited and reimbursement checks and surety bonds will be issued to unsuccessful bidders following the bid award. The successful bidder will be required to provide Performance and Payment Bonds in the amount equal to 100% of the contract price, within ten (10) business days after the bid award. Contractors shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS 130/1-12) including Public Act 100-1177 effective June 1, 2019. Bids may not be withdrawn for a period of 90 days after the bid opening date. Questions Due to City:February 13, 2023, 12:00pm

Bid Results

Municipal

$798,917.00

Public - City

New Construction, Site Work

36

22

31

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
41
Bidding Soon
569
All Active Projects
259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

April 24, 2023

img_map_placeholder

25432 Davis Lodge Rd, Hudson, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.