BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2026 at 8:00 PM

Updated March 30, 2026

Renovation of a mixed-use development in Rufus, Oregon. Completed plans call for the renovation of a power facility.

02/24/2026: Amendment 1 remains forthcoming and is expected to be published in the coming week. This amendment will formally extend the phase 1 proposal due date to Friday, 04/03/2026, as well as provide some revisions to technical information. Phase 1 proposal instructions and evaluation criteria remain unchanged through amendment 1. Additionally, this project was solicited before the 02/01/2026 effective date for the Department of War's adoption of the Revolutionary FAR Overhaul (RFO), therefore, no revisions to the solicitation to adopt the RFO are required, or planned. 01/09/2026: The Phase 1 solicitation package, which includes the phase 1 solicitation with specifications, solicitation drawings, reference drawings, bid schedule, and brand name justification, is attached. Amendment 1 is anticipated to be issued on or before 02/25/2026 to address the Revolutionary FAR Overhaul (RFO) (https://www.acquisition.gov/far-overhaul) and any other revisions deemed necessary at that time. Upon issuance of Amendment 1, the Government intends to extend the Phase 1 solicitation closing date by approximately one month. The official revised closing date and time will be posted on SAM.gov. End date - 2/3/2048

Sub-Bidding

Power Plant

$500,000,000.00

Public - Federal

Renovation

380

19

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
1
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

June 1, 2026

Project location map

To Be Determined, Rufus, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.