BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a civil project in Fernley, Nevada. Completed plans call for site work for a water / sewer project.

The work under this contract will repair and rehabilitate portions of the Farm District Road Lift Station and the surrounding infrastructure. The work generally includes forcemain and gravity flow bypass piping and pumping, manhole replacement, gravity main replacement/relining, and new appurtenances, new Flygt pump and mixer with electrical controls, and manhole/vault collar installation. Completion Date: 02/11/2022 The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. This project will rebid in January 2022.

Bid Results

Water / Sewer

$548,025.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
24
Bidding Soon
252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2021

October 8, 2021

Project location map

Farm District Rd, Fernley, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.