Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Tipton, Indiana. Working plans call for the renovation of a educational facility.
The owner has selected a Construction Manager. The 2022 Elementary School Renovation Project is for the renovation, update and or remodel of the existing Tipton Elementary School. The 2022 Elementary School Renovation Project is currently anticipated to include, but not limited to, space reconfiguration, including, but not limited to, areas involving the cafeteria and media center, replacement of interior finishes, including, but not limited to, all or any portion of the floor, wall and ceiling finishes and coverings, updating of all or any portion of the telecommunications and technology infrastructure and acquisition of furniture and other equipment. Include separate fees for Pre-Construction and Construction Phase services to be performed by the CMC based on the proposed 2022 Elementary School Renovation Project scope. A. Preconstruction Services: a. The proposed fixed fee for Pre-Construction Servicesto include: Planning and Scheduling, Estimating, Value Management, Quality Review, Preparing Contracts for Construction, Life-Cycle Costing, Front End Specifications, Bid Procurement, Tracking Costs Against the Budget, Design Meetings and all Staffing Costs. B. Construction Services: a. Provide a fixed fee for Construction Services to include: Cost of all on-site and off-site CMC staff that will be working on the 2022 Elementary School Renovation Project. Provide an Effort Schedule that identifies the estimated man hours charged each month by each staff position over the course of the 2022 Elementary School Renovation Project. These hours should be multiplied by an hourly billing rate that include wages and customary fringes per the Effort Schedule. In addition to a lump sum staffing cost, provide a monthly staffing cost that can be added to, or subtracted from, the lump sum cost once the construction duration has been determined. b. Provide a fee percentage for overhead and profit that will be multiplied by the Cost of the Work. C. The Proposal does not need to identify the predicted costs for the following (these items will be considered reimbursable expenses). Items to be included in the General Conditions will be: safety equipment, first aid supplies, handrails and toe boards, opening protection, fire extinguishers, temporary fencing, storage rental, temporary toilets, temporary stairs, temporary enclosures, temporary barricades, project signs, bulletin boards, on-site equipment, printing, telephone expenses, temporary power service, temporary water service, temporary heating service, heating energy charges, temporary wiring, temporary lighting, regular clean-up, trash dumpsters, dump permit and fees, traffic control, temporary roads, roadway maintenance, job trailer/trailer utilities, material testing, project website, permitting and all other jobsite construction-related miscellaneous expenses excluding construction manager staffing costs. The CMC's employee expenses shall be included within the fixed CMC Fee as previously noted above in Item III.B.a. D. Items to be completed by other Consultants (Paid directly by the Owner): - Architecture and Engineering - Site Surveys - Soil Explorations E. The CMC Contract shall be based on the modified AIA A133 - 2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price and the modified AIA A201 - 2017 General Conditions of the Contract for Construction, which are both attached to this 2022 Elementary School Renovation Project RFP. E. The cost of work for the CMC Services is to be based on $4,600,000. Construction June, 2022- June, 2023
Pre-Construction/Negotiated
Educational
$4,600,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 21, 2021
June 1, 2022
1099 S Main St, Tipton, IN
Related To This Project
Tipton, IN
Bid Date: Feb 20 2023
Tipton, IN
Bid Date: Mar 13 2023
Tipton, IN
Bid Date: Mar 13 2023
Tipton, IN
Bid Date: Mar 08 2023
Tipton, IN
Bid Date: Sep 21 2021
Tipton, IN
Bid Date: Aug 23 2022
Tipton, IN
Bid Date: Aug 10 2022
Tipton, IN
Bid Date: Jun 09 2022
Tipton, IN
Bid Date: Feb 09 2022
Tipton, IN
Bid Date: Mar 21 2022
Tipton, IN
Bid Date: Apr 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.